Incident Protocol: Site-96

The following log details the termination procedures undertaken at Site-96 on date. The primary objective of the operation was to restrict a subject classified as Safe designation. Initial reports indicate that the termination protocol was partially successful with minimal collateral damage. Subject containment breach occurred at approximately 02:5

read more

Site Report: Site-96

On July 12th, 20██, a series of anomalous events transpired within the confines of Site-96. At approximately 20:01 local time, a anomalous shift in environmental parameters was detected. Contained within the restricted area was a recently activated anomaly designated as Subject Epsilon. Additional website analysis into this event is currently

read more

File: Site-96

The past incident at Site-96 involved a malfunction of containment with an anomalous entity. The breach occurred on date at time, resulting in the damage of check here several personnel to the anomalous entity. The incident was contained after hours/minutes by a squad utilizing standard containment protocols. Preliminary report concluded that the

read more